The scope of this work is to grind out deteriorated sections of asphalt on city streets to a depth of 2.5, 3 or 4 inches, depending on pavement condition and then inlay new asphalt. The City’s Pavement Management Analysis Report was used to determine which pavement sections will receive these asphalt repairs.
Completing asphalt pavement repairs, as directed, is a cost-effective strategy to restore structural integrity to an otherwise sound street section and the timely repair of streets decreases long-term maintenance costs by postponing more costly reconstructions and producing a smoother ride for the traveling public.
Asphalt pavement repairs are ongoing. Please note: Work schedules are dependent on weather conditions and other factors. Always slow down within construction zones. Drivers should use designated detour routes.